South to North Water Diversion Project
2017-02-15 11:51:16
The runoff diversion through the filter before dosing, mechanical mixing, grid flocculation, inclined tube sedimentation, filtration, filter type V after dosing and other measures to reach the standard of drinking water. After the completion of the water plant, can effectively improve the quality of drinking water, so that local people drink clean, sanitary and safe water.
Water treatment capacity of 80000m3/d, long-term planning 100000m3/d, water production and office space construction area of 12500m2, 30 kinds of size pool, water storage capacity of 28000m3;